This activity will encompass two (2) analytical methods that will be performed in 773-A, B-111: Interfacial Tension (IFT) and Oil/Grease Analysis b…
Evaluate and repair roof leak over Rooms 231 and 240 in Building 703-41A. The subcontractor will not disturb the existing roof while performing the…
This R&D activity will determine the heating capabilities of an oven for potential insertion in a process.…
This project will determine the compression ratio across each pump stage of an Adixen Molecular Drag Pump (MDP5011) backed by a Metal Bellows MB-60…
This proposed activity will remove floor tiles and rotted cabinets in 705-H room 46. Floor tile removal will be worked as an asbestos task. New low…
Remove and replace insulation around the following Inlet Valve CCL-04 (WO# 01701925), Valve - Header Blowdown to Sump (WO# 01708340), and around a…
Building 728-N was formerly a shipping cask and railroad car repair facility. It is no longer an active facility, all utilities have been isolated,…
Facility Service Water Isolation Valve 002 has failed. Maintenance will replace valve due to normal wear and use. Qualified trained Asbestos Mainte…
Clean and repair/resurface ceiling in Building 772-F East Corridor.…
Excavate and repair underground leaking PVC discharge line at lift station behind 709-1G Fire Station. Leak is suspected to be a fitting or split p…