Install a new laboratory hood in Building 773-A, Lab B-147 and 151 along with two Spectrometers and supporting services.…
There is a need to set up three washing machines outside of 719-H in the Ambulance Bay.…
Site construction will clean the floor at Building 731-6N of bird droppings using a clorox bleach solution.…
Re-caulk windows at the southeast and northeast corners of 730-B.…
Remove designated areas of crusher run and replace with asphalt.…
Replace 16 1000W HID lighting fixtures in 717-F Jumper Shop bay with a comparable LED type, Lithonia Model number JHBL 45000LM ACL WDMVOLT GZ10 40K…
Replace carpet, floor covering, and cove base in Building 707-F.…
Repair chill water leak in Air Handling Unit number 4.…
Pending the completion of renovation activities in 773-A, B-147 and 151 Analytical Development Section (ADS) will install and operate an Agilent770…
SRNL will use an organic carrier to introduce a metallic or ceramic compound to the internal surface of a pinch weld and then conduct pinch weldtri…