Subcontractor will provide roof repairs at Building 716-4A.…
773-A, B135 and 139 is a multi-purpose laboratory equipped with instrumentation to process and or analyze liquid, solid, and gaseous samplesutilizi…
Inspection and treatment of approximately 414 wooden street and fence Poles in K-Area.…
As part of the modified Phase 4 plan for the 288-F Ash Basin Landfill Reclamation Project, this activity will involve relocation of approximately3,…
This EEC is written to cover solvent qualifications associated with the Salt Waste Processing Facility, SWPF.…
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work order.…
The proposed activity is to replace the roofing systems over 773-A, E-004, 008, 131 and conduct warranty repairs as needed.…
The Materials Compatibility and Welding Technology group presently houses three electrical resistance welding stations, two self contained lowpower…
Removal of asbestos containing material, ACM, and presumed asbestos containing material, PACM, from multiple ancillary buildings in thevicinity of …
Install two wall mounted HVAC units, or engineering approved equal, and any supporting electrical outlets or power sources.…