Vendor to clean decomissioned 275-gallon diesel fuel tank.…
Modify Section B Main Floor Service Corridor and adjacent spaces to provide a contiguous contamination area between the lab modules in thisportion …
Install approximately 350 feet of duplex fiber optic cable (OS2-Singlemode (9/125)-Duplex-Fiber Optic Cable-FC to FC) from the EOCProjector Room (E…
Dominion Energy to install new guy anchors due to transmission pole work near 751-B (Station 72).…
This activity is for the potentiometric measurement of uranium (U) content for a wide variety of samples.…
This proposed activity will employ H Canyon's Electrolytic Dissolver to process Fast Critical Assembly (FCA) material.…
Subcontractor will provide roof replacement at Building 722-A.…
This EEC applies to the cleaning, cutting and dissolution of Plutonium (Pu) metal.…
Subcontractor will provide roof replacement at 736-A.…
This activity involves the determination of Plutonium (Pu) and Neptunium (Np) in aqueous samples via the Control Potential Coulometry methodin 773-…