623-30G Receptacle Installation.…
Vendor will pressure wash screens for Deepwell 905-108H.…
Six, 6, new hard wall offices will be constructed on the 2nd floor of Building 730-B.…
Abandonment of General Separation Area Eastern Groundwater monitoring wells HAA-12A, HAA-13A and HAA-15A.…
Chiller and HVAC units require periodic coil cleaning, the majority of these PM are yearly.…
Magnetic nanoparticles will be prepared and mixed with heavy crude oil to form a paste for induction heating and viscosity reduction.…
Install carpet and paint room A129 in 772-F.…
This EEC addresses the MT to design and install an interim replacement for the obsolete Glovebox Oxygen Monitors parts in the TritiumExtraction Fac…
Install hands free water dispensers in 704-C, 703-43A, and 704-N.…
Remove and replace floor tiles in select portions of the Purification Area within the K-Reactor, and prep and paint select wall locations.…