Removal of presumed asbestos containing material (PACM) gasket material at 784-7A Steam Plant in various flanged connections to allow for maintenan…
Americium will be electrodeposited onto a solid substrate from an acidic media. Rev. 1 changes lab that work will be performed in.…
This activity details the general operation of the FormLabs Form2 SLA resin 3D printer along with the post-processing tasks associated with 3D prin…
Refurbish F-Area entrance signs.…
Plutonium metal will be brought into SRNL for packaging in a long term configuration. Rev. 1 added Labs B135/139 to activity location.…
607-70G Remove insulation from process water line in Ditch 1.…
Remove, replace, reinstall MST-TRP-001 (steam trap) associated piping, insulation (non-asbestos), and potentially asbestos containing material (PAC…
Remove two presumed asbestos containing material (PACM) gaskets from Recovery Well 8 to allow for routine maintenance.…
Upgrade 254-5H Diesel Fuel Level/Leak Detection System with a Veeder Root Level/Leak Detection System.…
This proposed activity will remove additional insulation from the 150 pound steam to trap to allow for leak repairs.…