Install two new pieces of equipment, a Flying Probe Tester and an air compressor in Building 730-A.…
Replace the 720-2A Automatic Transfer Switch, A721-600-ATS-01, due to suspected lightning strike.…
NDE Inspection of the DBCF underground piping.…
Replace and remove lighting fixture for outside roof lights on 292-2F with LED upgrade.…
The Process Technology Programs, PTP, will conduct laboratory scale simulations of the Defense Waste Processing Facility, DWPF, process at the Aike…
Remove and replace 922 Condensate Tank Pump A in -20 of 105-L.…
Repair deteriorated I-Beam at 716-N.…
The EEC was revised to include the United States Forest Service, USFS, the design and installation of the access roads and turn around points to tw…
Remove heat exchanger plug covers and seal plugs and joints with Blue Max.…
Pave additional areas South of H-Tank Farm to support personnel.…