CX-021966: Characterization Soil Bores Northwest of M Area Settling Basin

The EEC was revised to include the United States Forest Service, USFS, the design and installation of the access roads and turn around points to tw…

Office of NEPA Policy and Compliance

June 9, 2020
minute read time

The EEC was revised to include the United States Forest Service, USFS, the design and installation of the access roads and turn around points to two of the soil boring locations.