Provide and install all materials and wiring necessary for the installation of a new fiber optic cable between 719-5N and the new PECMC yard office…
Remove damaged section of non-asbestos insulation and jacketing from abandoned steam line south of 285-H. Remaining insulation and jacketing will b…
Replace the 285-H steam driven turbine with a like-for-like replacement.…
Remove domestic water valve H-234000-DW-V-80.088 from the domestic water system by cutting brass nipples as needed per M-DCF-H-13606. Relocate stra…
Troubleshoot and repair Heating Water Circulating Pump #005 in Building 735-1B.…
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F.…
Install conduit, wiring, and receptacles for Exit and Emergency lights in Building 789-B.…
Replace carpet in Building 703-A.…
Create an asphalt floor and entry/exit to quonset hut in the gravel lot north of the KAC main parking lot.…
Install an Electric Discharge Machine (EDM) in building 234-H that requires a chilled water unit, electrical supply, instrument air supply, de-ioni…