Vendor will pressure wash screens for Deepwell 905-108H.…
Six, 6, new hard wall offices will be constructed on the 2nd floor of Building 730-B.…
This EEC addresses the MT to design and install an interim replacement for the obsolete Glovebox Oxygen Monitors parts in the TritiumExtraction Fac…
Remove both Uninterruptible Power Supply, UPS, systems in Building 234-H, Room 340 to provide addtional work space in the area.…
Under project Y757, the E3S system was replaced with the Argus Security System in 234-H.…
Remove and replace floor tiles in select portions of the Purification Area within the K-Reactor, and prep and paint select wall locations.…
The 701-3H Entry Control Facility into the Tritium Limited Area, LA, is currently an unoccupied space.…
Install additional receptacles in Building 736-A, Room 131.…
Repair and Replace Packing of 1 Steam Valve Outside of K-Area Purification and 2 Steam Valve Inside of Purification…
Make repairs to floor of 704-37E and 704-29E.…