Install hands free water dispensers in 704-C, 703-43A, 704-N, and 703-46A.…
The subcontractor shall replace wooden line switch ties from the railroad bed, identified by site transportation and engineering as part of the 202…
SRNL Research and Development Engineering will be conducting a fire suppression test in 723-A to support the Surplus Pu Disposition Project in K-Ar…
Venting or direct-shipment and disposal of specialty gas cylinders, nitrogen, carbon dioxide, compressed air, in A Area.…
Perform structural repairs on 772-F and 772-1F per the structural integrity program, SIP, inspection report T-CLC-F-00557.…
This proposed activity will install a spill containment box and vapor stimulator tubes at 254-5H Fuel Oil Underground Storage Tanks, FOUSTs, to all…
Install Universal Wiring, UW, drops in Building 730-2B.…
A vendor will generate and or remove excess wastewater from various systems and containments located across SRS.…
The 233-24H warehouse building heat pump is being replaced and utilizes slightly different controls.…
This ongoing activity includes the operation of several gas chromatographs and a liquid chromatograph and mass spectrometer in 735-A, 735-11A and 7…