Excavate 16,820 m3 (22,000 yd3) of ash and contaminated soil media from the boundary of the P-Area Ash Basin to the edge of the 30-m (100-ft) buffe…
Ten soil vapor extraction wells (SVE) wells will be disconnected from the Western Sector Treatment System (WSTS) active SVE system and reconfigured…
On Saturday, May 4, 2019, the fire water line west of 221-H South Dock failed. A sink hole was created by the water flow which caused a bollard to…
The DE vessel installed in Room 17 Diffuser System had two of four heater elements fail. In efforts to continue production, the remaining two heate…
Install a domed bubble mirror in Building 772-F men's change room ceiling to cover blind spot in the walkway near the south entrance. …
Remove two presumed asbestos containing material (PACM) gaskets from Totalizer at Recovery Well 2 to allow for routine maintenance.…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on #2 Service Water Pump.…
Remove insulation from valve in 235-F Steam Station to replace valve. …
Replace well water valve WW-V-074 at 285-H.…
Building 704-20N is a double-wide trailer that was used as an administrative office for radiological control operations personnel. The building's …