The ICW Booster Pump and motor need to be replaced due to age.…
The project objective is to produce a proof of concept for enhanced mechanical performance and durability of portland cement-based reinforcedcompos…
Installation and operation of a Stand Alone Gas Dilution Manifold in 234-H, room 267 to support development of low concentration tritium gasstandar…
The Inert Metalography Laboratory Tritium Recovery System (IML TRS) is no longer operational and permanently out of service.…
This work will replace existing HVAC systems located in building 735-7A due to the age and the condition of the equipment.…
The outdoor Motor Control Center (MCC) requires replacement due to age and cost and availability of replacement parts.…
Pour two concrete pads near 794-A, and install platforms to allow gauge readings at the fuel tank to be safely taken and to allow safe access the s…
Dominion Energy to install new guy anchors due to transmission pole work near 751-B (Station 72).…
Modify Section B Main Floor Service Corridor and adjacent spaces to provide a contiguous contamination area between the lab modules in thisportion …
Install approximately 350 feet of duplex fiber optic cable (OS2-Singlemode (9/125)-Duplex-Fiber Optic Cable-FC to FC) from the EOCProjector Room (E…