This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket and gasket-likemater…
Install PA System from pole 265T to 716-4A.…
Two breathing air pass throughs are needed on the exterior walls of 234-7H to allow portable breathing air to be used within Building 234-7H.…
Renovation of restroom in Building 751-1A.…
This EEC covers the removal of the inlet HEPA Filters and the respective housings that were used to support Cabinet 25 operations in F091.…
In support of various R and D activities, this task involves the cleaning of metals using the additive Nitradd.…
High winds from a recent storm damaged a covered deck between buildings 22 and 23 within the MOX Complex Area.…
This EEC covers the removal of 3 inlet HEPA Filters and the respective housings that were used to support Cabinet 26 operations in F091.…
Establish a field location and install a 10-year field experiment to simulate and study the movement of radiounuclides through an artificial vadose…
Modify the driving path of the Shielded Canister Transporter, SCT, to and from both S-Area Glass Waste Storage Buildings, GWSBs, 250-S and251-S, to…