This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is not required. These exca…
Removal of two 1/2"-asbestos gaskets from an Inlet Sample Valve on the Purge Water Tank # 1 in M-Area (M-782002) and replace with asbestos gaskets.…
Preparation of reagents and non-radioactive quality control standards in support of Analytical Laboratories.…
A High Performance Liquid Chromatography (HPLC) system is used by Analytical Development for organic sample analysis. Sample aliquots injected into…
This R&D project will be examining separation of various uranium salts from environmental samples. The separation will employ solvent extraction us…
Repairs are needed for a damaged wall in room 1056 at 766-H.…
Temporary modification, 233H-TMC-18-256, is initiated to replace the currently installed water trap # 2 level probe (H-233000-STRP-LE-ZR.290L), loc…
The Uninterupted Power Supply (UPS) located in the Purification Area of the K-Area Complex, which services various components of the safeguards and…
The scope of this activity covers the initial assembly, test setup and operation of the helium (He) leak detection equipment and instrumentation fo…
Corrective maintenance activity is required on the 607-46G lift station in order for it to work properly.…