The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam, L-La…
During October 2018, the manufacturer of the existing 234-H FACP provide a notification of End of Service Life.…
A subcontractor will remove sludge and or waste water from various sanitary waste water systems at SRS.…
This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket and gasket-likemater…
Renovation of restroom in Building 751-1A.…
Install PA System from pole 265T to 716-4A.…
Two breathing air pass throughs are needed on the exterior walls of 234-7H to allow portable breathing air to be used within Building 234-7H.…
Establish a field location and install a 10-year field experiment to simulate and study the movement of radiounuclides through an artificial vadose…
In support of various R and D activities, this task involves the cleaning of metals using the additive Nitradd.…
This EEC covers the removal of 3 inlet HEPA Filters and the respective housings that were used to support Cabinet 26 operations in F091.…