Install operator panels to MCC 1, MCC 8, and MCC 9.…
The primary goal is to measure the separation of the organic chemicals from the feed.…
Three degraded trailers known to contain asbestos containing materials will be demolished within the SRNL Limited Area.…
Scope of work to expand parking lot 613-K to include approximately 18 additional parking spaces.…
623-30G Receptacle Installation.…
Chiller and HVAC units require periodic coil cleaning, the majority of these PM are yearly.…
Install carpet and paint room A129 in 772-F.…
Abandonment of General Separation Area Eastern Groundwater monitoring wells HAA-12A, HAA-13A and HAA-15A.…
Magnetic nanoparticles will be prepared and mixed with heavy crude oil to form a paste for induction heating and viscosity reduction.…
Install hands free water dispensers in 704-C, 703-43A, and 704-N.…