Replace Carpet in Room 1059 of Building 766-H.…
Replace Cove Base and Paint Room 125 in Building 707-7F.…
Correct and replace faulty electrical wiring between G2-681-3-ELNH-BKR-P1-2D and G2-681-3-ELNH-DISC-001 in 681-3G Pump House.…
Remove old doors and replace entry doors on Trailers 704-22G,704-23G and 704-25G.…
Perform cleaning, seal coating, and restriping of parking lot in F-Area. Clean and stripe main parking lot in F-Area.…
The activity includes designing, installing, and operating a new remediation well, similar to the existing remediation well RWM-18, that pumps grou…
A Non-Time Critical (NTC) Removal Action will be conducted for the C-Area Groundwater (CAGW) Operable Unit (OU) TCE plume. The NTC Removal Action w…
Replace Discharge Pump #1 at the 607-1M lift station due to failure.…
Adding additional grab ports to the MS3 grab sample manifold.…
This scope of work is to remove any existing material from the three specified expansion joints—one of which lacks any sealant and is cracking—and …