Produce complex metal parts from 3D computer-aided design, CAD, models via electron beam melting.…
The sinks in the 704-L Men's Change Room are plugged.…
The 216-L Sump Pump discharge check valves 216-A and 216-H need to be replaced.…
MOX-Termination has determined that portable building SRS-PB-EX-0027 is now excess.…
Replace existing propane monitors at Building 754-11A.…
Repair cracking, spalling, detaching of concrete along expansion joints and construction joints of the 221-H concrete exterior walls.…
Oxidant injection to enhance remediation of chlorinated ethenes-tetrachloroethene, trichloroethene, and daughter products...…
Apply water-proof coating and sealant to newly installed plywood on top of cell No. 4 on 785-2A, Cooling Tower 2.…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
This EEC addresses the installation of 12 groundwater monitoring wells and eight injection points ...…