The Fischer-Tropsch Synthesis, gaseous-phase reaction, will be performed in stainless steel vessels and reaction products analyzed by gas chromatog…
The subcontractor, Queen City Railroad Construction, shall replace wooden line switch ties from the railroad bed, identified by site transportation…
Tritium Extraction Facility, TEF, Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
This activity covers the steps necessary to prepare mechanical testing samples for digital image correlation in 999-2W lab 155.…
Testing to evaluate the solubility of particular metals in support of DWPF Nuclear Criticality Safety Evaluations.…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…
The Inert Metalography Laboratory, IML, Tritium Recovery System, TRS, is no longer operational and permanently out of service.…
This EEC covers the use of the Eltra 2000 Oxygen, Nitrogen, and Hydrogen Analyzer in the 999-2W EMRL Lab 194.…
Remove the Inert Metallography Laboratory Tritium Recovery System, IML TRS, process chiller from service by providing air gap isolation of the chil…
This evaluation covers operation of miniature mixer-settlers used for solvent extraction in 773-A laboratories C-077 and C-135 and 139.…