CX-022001: Section E Shielded Cells 7, 9, and 13 Windows Replacement

The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…

Office of NEPA Policy and Compliance

May 12, 2020
minute read time

The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a loss of visibility through the windows.