Repair of Big Hill Texas-14 Transformer CX(s) Applied: B1.3 Date: 06/24/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters CX(s) Applied: B5.2 Date: 06/24/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Hydrogen Peroxide Treatment of Strategic Petroleum Reserve Heat Exchangers BOA CX(s) Applied: B1.3 Date: 04/23/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to West Hackberry Brine Tanks, Government Furnished Equipment CX(s) Applied: B1.3 Date: 04/22/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to West Hackberry Brine Tanks CX(s) Applied: B1.3 Date: 04/22/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Purchase of Big Hill Control Valve Assembly CX(s) Applied: B1.3 Date: 04/16/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Strategic Petroleum Reserve Site Workover Support Activities, 2016-2020 CX(s) Applied: B5.12 Date: 01/07/2013 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Blast and Paint West Hackberry, Texas 22 Header Piping CX(s) Applied: B1.3 Date: 01/23/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Video Inspection of Bryan Mound 36-inch Raw Water Pipeline CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Strategic Petroleum Reserve Site Subsidence Surveys, 2013-2017 CX(s) Applied: B3.1 Date: 01/02/2013 Location(s): Louisiana, Texas, Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office