Rework Big Hill 36” Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3 Date: 04/19/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank CX(s) Applied: B1.3 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
West Hackberry Building 301 Air Handling Unit-1 Heating, Ventilation, and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Re-work Bryan Mound 30” Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replacement Anode Bed on West Hackberry 42-inch Crude Oil Pipeline at Gum Cove Road CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Transport and Perform TD&I on Big Hill TX-29 Transformer CX(s) Applied: B1.3 Date: 03/28/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Strategic Petroleum Reserve Bi-Annual Electrical Preventative Maintenance CX(s) Applied: B1.3 Date: 02/23/2012 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Bayou Choctaw Building 401 Air Handling Unit-3 Heating, Ventilation and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 02/01/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Fiscal Year 2012 Annual Site Subsidence Surveys CX(s) Applied: B3.1 Date: 01/18/2012 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Big Hill Vacuum Truck CX(s) Applied: B1.3 Date: 01/17/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office