Categorical Exclusion Determinations: Office of Petroleum Reserves

Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank GFE CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill RWIS Oil Water Separator Tank with Concrete Tank GFE CX(s) Applied: B1.3 Date: 05/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Clean, Seal, and Paint West Hackberry Buildings RW MCC 392, Substation 390 and MCC 317 CX(s) Applied: B1.3 Date: 05/08/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Remove Abandoned Bayou Choctaw Timber Bridge Over North/South Canal CX(s) Applied: B1.23 Date: 05/03/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank CX(s) Applied: B1.3 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
West Hackberry Building 301 Air Handling Unit-1 Heating, Ventilation, and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office