Repair and Line Bryan Mound Brine Tank, BMT-1 CX(s) Applied: B1.3 Date: 12/18/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Pumping System for 100 MBD Cavern Capacity Maintenance CX(s) Applied: B1.15 Date: 12/12/2012 Location(s): Texas, Louisiana, Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to Bryan Mound Brine Tank, GFE CX(s) Applied: B1.3 Date: 12/11/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Loss of a Major Transformer at Bryan Mound or West Hackberry CX(s) Applied: B1.3 Date: 12/11/2012 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Big Hill Site Building Upgrades, Phase II CX(s) Applied: B1.3 Date: 12/11/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline CX(s) Applied: B5.2 Date: 11/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Bayou Choctaw Warehouse Firewater Piping CX(s) Applied: B1.3 Date: 11/26/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Alternate Source of Firewater at Bryan Mound CX(s) Applied: B5.2 Date: 11/05/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install) CX(s) Applied: B1.7 Date: 10/31/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Strategic Petroleum Reserve Emergency Pipeline and Piping Repair, 2013-2017 CX(s) Applied: B5.4 Date: 10/30/2012 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office