Categorical Exclusion Determinations: Office of Petroleum Reserves

Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline CX(s) Applied: B5.2 Date: 11/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install) CX(s) Applied: B1.7 Date: 10/31/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Strategic Petroleum Reserve Emergency Pipeline and Piping Repair, 2013-2017 CX(s) Applied: B5.4 Date: 10/30/2012 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Replace Sparge Piping at Bryan Mound Raw Water Intake Structure CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
New Orleans Emergency Generator Installation (900 Building) CX(s) Applied: B1.31 Date: 09/18/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office