Bryan Mound Substation Upgrade to 138 Kilovolts CX(s) Applied: B1.3 Date: 12/17/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Demolish State Police Radio Tower at West Hackberry CX(s) Applied: B1.19 Date: 12/10/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replacement of Big Hill TX-14 Transformer, Government Furnished Equipment CX(s) Applied: B1.3 Date: 10/31/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Bryan Mound Brine Disposal Pump Replacement (Install) CX(s) Applied: B5.2 Date: 10/28/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
West Hackberry RWIS Recycle Valve Upgrade CX(s) Applied: B1.3 Date: 10/15/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replacement of Deep-Anode Ground Bed Sites for Big Hill Cavern 104 and Site Unit 1 “A”, and BC Cavern 18 CX(s) Applied: B1.3 Date: 10/01/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters Government Furnished Equipment CX(s) Applied: B5.2 Date: 09/17/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Blast and Paint West Hackberry Meter Skid, Prover Piping and Structure CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Smart and Calibrated Pig Surveys of Strategic Petroleum Reserve Raw Water/Crude Oil Pipelines CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Clean and Inspect West Hackberry T-15 Brine Tank CX(s) Applied: B1.3 Date: 08/19/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office