Categorical Exclusion Determinations: Office of Petroleum Reserves

Close Big Hill Anhydrite Pond 9- Pilot Test Temporary Pipe Re-route CX(s) Applied: B3.6Date: 01/13/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229) CX(s) Applied: B1.4 Date: 06/30/2014 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Offsite Inspection and Repair of DOE Workover Rig #155 (PR 10090916) CX(s) Applied: B1.3 Date: 06/24/2014 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office