Big Hill Anhydrite Pond 9 Closure CX(s) Applied: B1.23Date: 01/26/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Close Big Hill Anhydrite Pond 9- Pilot Test Temporary Pipe Re-route CX(s) Applied: B3.6Date: 01/13/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
BHP-3 Offsite Bump Repair CX(s) Applied: B1.3Date: 41885 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Windows of Bryan Mound Portal Building #281 CX(s) Applied: B1.3Date: 41884 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace West Hackberry Radio Tower CX(s) Applied: B1.19Date: 41880 Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office
Hydrogen Sulfide Scavenger BOA (Multiple) CX(s) Applied: B5.2Date: 41880 Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office
Convert BMT-2 to External Floating Roof Tank CX(s) Applied: B1.3Date: 41878 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Direct Assessment and Repair of BH-SUN 36-inch Crude Oil Pipeline CX(s) Applied: B5.4Date: 41869 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229) CX(s) Applied: B1.4 Date: 06/30/2014 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Offsite Inspection and Repair of DOE Workover Rig #155 (PR 10090916) CX(s) Applied: B1.3 Date: 06/24/2014 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office