Replace High Voltage Primary Bushings for GHTX-14 at RWIS CX(s) Applied: B1.3Date: 04/22/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
April 22, 2015Replace High Voltage Primary Bushings for GHTX-14 at RWIS
CX(s) Applied: B1.3
Date: 04/22/2015
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, tools, equipment, and transportation required to replace the high voltage primary busings, surge arresters, and related electrical testing to transformer, BHTX-14, located at the Big Hill Raw Water Intake Structure (RWIS).