Re-coat WHT-15 Brine Tank (WH-MM-819D) CX(s) Applied: B1.3Date: 03/24/2015Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
March 24, 2015Re-coat WHT-15 Brine Tank (WH-MM-819D)
CX(s) Applied: B1.3
Date: 03/24/2015
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to re-coat the WHT-15 Brine Tank. Tasks include blasting, prepping and re-coating the WHT-15 Brine Tank.