Big Hill Site Building Upgrades, Phase 2 CX(s) Applied: B1.3Date: 08/10/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace 6" Piping at West Hackberry Disposal Wells CX(s) Applied: B1.3Date: 08/03/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Windows on Big Hill and Bryan Mound Entry Portal Buildings CX(s) Applied: B1.3Date: 08/03/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Bayou Choctaw Brine Disposal/Recycle Piping in Pump/Pond Area CX(s) Applied: B1.3Date: 07/17/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
Clean Bryan Mound Crude Oil Tank, BMT-4 CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
BH Anhydrite Pond Chlorides Wash - Pilot Test and Full Pond Chlorides Wash CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
BH Anhydrite Pond Sample Collection and Analysis - Pilot Test and Full Pond Chlorides Wash CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
Remove Oil from Bryan Mound Crude Oil Tank BMT-4 Sump CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
Repair Bayou Choctaw Brine Disposal Road (LANG and Subcontractor) CX(s) Applied: B1.3Date: 05/27/2015 Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office
Very Early Smoke Detection Apparatus (All SPR Sites) CX(s) Applied: B2.2Date: 05/18/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office