Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200) CX(s) Applied: B1.3Date: 09/21/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
September 21, 2015Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200)
CX(s) Applied: B1.3
Date: 09/21/2015
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, materials, equipment, and transportation required to locate, excavate, and inspect two locations on the Big Hill 48-inch Raw Water Intake Structure pipeline. All excavation work must be performed within the existing pipeline right-of-way and the post repair work must return the disturbed areas to the original contours.
CX(s) Applied: B1.3
Date: 09/21/2015
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, materials, equipment, and transportation required to locate, excavate, and inspect two locations on the Big Hill 48-inch Raw Water Intake Structure pipeline. All excavation work must be performed within the existing pipeline right-of-way and the post repair work must return the disturbed areas to the original contours.