Replace West Hackberry Raw Water Injection Pump Discharge Piping and Recycle Line (WH-MM-1106) CX(s) Applied: B1.3Date: 11/04/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
November 4, 2015Replace West Hackberry Raw Water Injection Pump Discharge Piping and Recycle Line (WH-MM-1106)
CX(s) Applied: B1.3
Date: 11/04/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all labor, tools, materials, equipment, supplies, transportation, facilities, services and supervision required to replace the West Hackberry raw water injection pump pad discharge piping and recycle line.
CX(s) Applied: B1.3
Date: 11/04/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all labor, tools, materials, equipment, supplies, transportation, facilities, services and supervision required to replace the West Hackberry raw water injection pump pad discharge piping and recycle line.