Convert BMT-2 to External Floating Roof Tank CX(s) Applied: B1.3Date: 41878 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Direct Assessment and Repair of BH-SUN 36-inch Crude Oil Pipeline CX(s) Applied: B5.4Date: 41869 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229) CX(s) Applied: B1.4 Date: 06/30/2014 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Offsite Inspection and Repair of DOE Workover Rig #155 (PR 10090916) CX(s) Applied: B1.3 Date: 06/24/2014 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Maintain/Repair SPR Radio Communications Network, 2014-2017 CX(s) Applied: B1.7 Date: 06/11/2014 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Replace West Hackberry Ported Coax at Northwest Perimeter (WH-OM-1194) CX(s) Applied: B1.7 Date: 06/09/2014 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Purchase of West Hackberry Gate Valve Replacement Parts CX(s) Applied: B1.3 Date: 05/27/2014 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Rework West Hackberry 36” Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3 Date: 12/10/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Big Hill Anhydrite Pond Sampling and Analysis CX(s) Applied: B3.1 Date: 09/23/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Bryan Mound Upgrade Wood to Steel Light Poles CX(s) Applied: B1.3 Date: 02/14/2014 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office