Record of Categorical Exclusion Determination to Replace Piping Header at Bryan Mound RWIS and RWIP (BM-MM-1027) CX(s) Applied: B1.3Date: 02/18/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Miscellaneous Pump Maintenance Parts, 2016-2020 (Multiple) CX(s) Applied: B1.3Date: 02/10/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Big Hill Anhydrite Pond 9 Closure CX(s) Applied: B1.23Date: 01/26/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Close Big Hill Anhydrite Pond 9- Pilot Test Temporary Pipe Re-route CX(s) Applied: B3.6Date: 01/13/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
BHP-3 Offsite Bump Repair CX(s) Applied: B1.3Date: 41885 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Windows of Bryan Mound Portal Building #281 CX(s) Applied: B1.3Date: 41884 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace West Hackberry Radio Tower CX(s) Applied: B1.19Date: 41880 Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office
Hydrogen Sulfide Scavenger BOA (Multiple) CX(s) Applied: B5.2Date: 41880 Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office
Convert BMT-2 to External Floating Roof Tank CX(s) Applied: B1.3Date: 41878 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Direct Assessment and Repair of BH-SUN 36-inch Crude Oil Pipeline CX(s) Applied: B5.4Date: 41869 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office