Replace West Hackberry Raw Water Injection Pump Discharge Piping and Recycle Line (WH-MM-1106) CX(s) Applied: B1.3Date: 11/04/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Deploy Wireless Guest Networks at Strategic Petroleum Reserve Sites CX(s) Applied: B1.7Date: 10/01/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Dredging of Bryan Mound Raw Water Intake Structure Inlet Channel CX(s) Applied: B1.3Date: 09/28/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
ADAS Life Cycle Management Services, 2015-2020 CX(s) Applied: B1.7Date: 09/25/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200) CX(s) Applied: B1.3Date: 09/21/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Bryan Mound Crude Oil Closed Drain System at Meter Skid (BM-MM-805) CX(s) Applied: B1.3Date: 08/31/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Critical Loop Transformers & Cables Damaged by Hurricane Ike CX(s) Applied: B1.3Date: 08/17/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Bayou Choctaw Wi-Fi/Radio Replacement Pilot CX(s) Applied: B1.7Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Install Packaged Central Heating, Ventilation and Air Conditioning Units for Bayou Choctaw Building 423 CX(s) Applied: B1.4Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill Critical Loop Transformers & Cables Damaged by Hurricane Ike CX(s) Applied: B1.3Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office