Replace Section of Bryan Hill 36-Inch Crude Oil Pipeline at Hillebrandt Bayou CX(s) Applied: B1.3Date: 12/22/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
December 22, 2015Replace Section of Bryan Hill 36-Inch Crude Oil Pipeline at Hillebrandt Bayou
CX(s) Applied: B1.3
Date: 12/22/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, equipment, materials, services, storage, and supervision required to manufacture, test and prepare 1,800 linear feet of API 5L, Grade X-52, PSL2 line pipe. Supplier to apply Fusion Bond Epoxy and Abrasion Resistant Overlay coatings to 1,700 linear feet of the pipe. The other 100 linear feet of pipe will remain as bare, black pipe for issuance to an induction bend fabricator by others. This pipe will be Government Furnished Product for installation by others under BH-MM-756.