CX-014463: Categorical Exclusion Determination

Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - Install (BM-MM-1203) CX(s) Applied: B1.3Date: 12/15/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

December 15, 2015
Estimated Read Time   min
Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - Install (BM-MM-1203)
CX(s) Applied: B1.3
Date: 12/15/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office

Vendor shall furnish all labor, tools, materials, equipment, and supervision required to install four oil water separators at Bryan Mound Caverns 1, 2, 4, and 5. The four oil water separators will be provide as government furnished equipment (GFE) by others under project BM-MM-1203A.

Document(s) Available for Download