Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - Install (BM-MM-1203) CX(s) Applied: B1.3Date: 12/15/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
December 15, 2015Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - Install (BM-MM-1203)
CX(s) Applied: B1.3
Date: 12/15/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Vendor shall furnish all labor, tools, materials, equipment, and supervision required to install four oil water separators at Bryan Mound Caverns 1, 2, 4, and 5. The four oil water separators will be provide as government furnished equipment (GFE) by others under project BM-MM-1203A.
CX(s) Applied: B1.3
Date: 12/15/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Vendor shall furnish all labor, tools, materials, equipment, and supervision required to install four oil water separators at Bryan Mound Caverns 1, 2, 4, and 5. The four oil water separators will be provide as government furnished equipment (GFE) by others under project BM-MM-1203A.