Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters Government Furnished Equipment CX(s) Applied: B5.2 Date: 09/17/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Blast and Paint West Hackberry Meter Skid, Prover Piping and Structure CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Smart and Calibrated Pig Surveys of Strategic Petroleum Reserve Raw Water/Crude Oil Pipelines CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Clean and Inspect West Hackberry T-15 Brine Tank CX(s) Applied: B1.3 Date: 08/19/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install) CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Strategic Petroleum Reserve Computer Services, 2015-2020 CX(s) Applied: B1.7 Date: 07/11/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Bayou Choctaw 500 KVA Power Transformer CX(s) Applied: B1.3 Date: 07/09/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace West Hackberry Brine Disposal System Header from MOV-51’s to WHT-14/15 Brine Tanks with HDPE Pipe CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Bryan Mound Brine Disposal Pump Replacement CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill Circuit Breakers OCB-4009, 4010 and 4011 CX(s) Applied: B1.33 Date: 06/28/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office