CX-011848: Categorical Exclusion Determination

Bryan Mound Upgrade Wood to Steel Light Poles CX(s) Applied: B1.3 Date: 02/14/2014 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

February 14, 2014
Estimated Read Time   min
Bryan Mound Upgrade Wood to Steel Light Poles
CX(s) Applied: B1.3
Date: 02/14/2014
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall furnish all labor, tools, materials, equipment, supplies, transportation, supervision and services required to upgrade the existing Bryan Mound wood light poles with new steel light poles.