Big Hill Fence Extension Modifications CX(s) Applied: B1.11 Date: 09/14/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Repair West Hackberry Brine Tanks, WHT-14 & WHT-15 CX(s) Applied: B1.3 Date: 08/28/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Replace Brine Disposal System Header to Bryan Mound Brine Tank CX(s) Applied: B1.3 Date: 08/28/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Replace Three Wood Poles-In-Kind at Bryan Mound West Gate CX(s) Applied: B1.3 Date: 08/23/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Variable Frequency Drivers for Raw Water Intake Structure Pumps Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/16/2012 Location(s): Texas, Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Dredging of the West Hackberry Raw Water Intake Structure CX(s) Applied: B1.3 Date: 08/14/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/06/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Big Hill Recycle Line Repair CX(s) Applied: B1.3 Date: 07/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Install Power Metering for Strategic Petroleum Reserve Site Buildings CX(s) Applied: B1.31 Date: 07/26/2012 Location(s): Louisiana, Texas, Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office