Categorical Exclusion Determinations: Office of Petroleum Reserves

Replace Sparge Piping at Bryan Mound Raw Water Intake Structure CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
New Orleans Emergency Generator Installation (900 Building) CX(s) Applied: B1.31 Date: 09/18/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Variable Frequency Drivers for Raw Water Intake Structure Pumps Government Furnished Equipment CX(s) Applied: B1.3 Date: 08/16/2012 Location(s): Texas, Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office