CX-009716: Categorical Exclusion Determination

Loss of a Major Transformer at Bryan Mound or West Hackberry CX(s) Applied: B1.3 Date: 12/11/2012 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

December 11, 2012
Estimated Read Time   min
Loss of a Major Transformer at Bryan Mound or West Hackberry
CX(s) Applied: B1.3
Date: 12/11/2012
Location(s): Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall provide all transportation, materials, equipment, supplies, tools, facilities, labor and supervision required to perform the electrical work needed to install and connect spare transformer BHTX-3 for emergency use in case of the loss of a major transformer at Bryan Mound (BM) (BMMTX-1, BMMTX-2, or BMMTX-3) or West Hackberry (WH) (WHTX-1 or WHTX-2). Temporary installation of BHTX-3 at BM or WH will be on existing slabs.