Recap West Hackberry Anhydrite Ponds (WH-MM-1334) CX(s) Applied: B1.3Date: 11/19/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
November 19, 2015Recap West Hackberry Anhydrite Ponds (WH-MM-1334)
CX(s) Applied: B1.3
Date: 11/19/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, equipment, materials, services, transportation, storage, and supervision required to recap the two West Hackberry Anhydrite Ponds.
CX(s) Applied: B1.3
Date: 11/19/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, equipment, materials, services, transportation, storage, and supervision required to recap the two West Hackberry Anhydrite Ponds.