Install West Hackberry Crude Oil Pipeline Temperature Monitoring System (WH-MM-784) CX(s) Applied: B1.3Date: 11/19/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
November 19, 2015Install West Hackberry Crude Oil Pipeline Temperature Monitoring System (WH-MM-784)
CX(s) Applied: B1.3
Date: 11/19/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, equipment, materials, services, transportation, storage, and supervision required to install a crude oil pipeline temperature monitoring system located on the West Hackberry 42-inch crude oil pipeline to the Sunoco Terminal.
CX(s) Applied: B1.3
Date: 11/19/2015
Location(s): Multiple Locations
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, equipment, materials, services, transportation, storage, and supervision required to install a crude oil pipeline temperature monitoring system located on the West Hackberry 42-inch crude oil pipeline to the Sunoco Terminal.