Replace Screen Wash Piping, Discharge Header & Recycle Line at West Hackberry RWIS (WH-MM-1105) CX(s) Applied: B1.3Date: 03/18/2015 Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
March 18, 2015Replace Screen Wash Piping, Discharge Header & Recycle Line at West Hackberry RWIS (WH-MM-1105)
CX(s) Applied: B1.3
Date: 03/18/2015
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, materials, equipment, and supervision required to replace the Screen Wash Piping, Discharge Header and Recycle Line at the WH Raw Water Intake Structure (RWIS).