June 30, 2014Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229)
CX(s) Applied: B1.4
Date: 06/30/2014
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all labor, materials, tools, equipment, supplies, transportation, supervision and services required to replace the two existing air conditioners in Bryan Mound Building No. 281 with a new single split system air conditioning unit.
CX(s) Applied: B1.4
Date: 06/30/2014
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all labor, materials, tools, equipment, supplies, transportation, supervision and services required to replace the two existing air conditioners in Bryan Mound Building No. 281 with a new single split system air conditioning unit.