Big Hill Anhydrite Pond Sampling and Analysis CX(s) Applied: B3.1 Date: 09/23/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
March 13, 2014Big Hill Anhydrite Pond Sampling and Analysis
CX(s) Applied: B3.1
Date: 09/23/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, tools, equipment, materials and transportation required to collect samples from the Big Hill anhydrite pond for chemical analysis.
CX(s) Applied: B3.1
Date: 09/23/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, tools, equipment, materials and transportation required to collect samples from the Big Hill anhydrite pond for chemical analysis.