Replace Brine Disposal System Header to West Hackberry Brine Tanks CX(s) Applied: B1.3 Date: 04/22/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
April 22, 2013Replace Brine Disposal System Header to West Hackberry Brine Tanks
CX(s) Applied: B1.3
Date: 04/22/2013
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall shall provide all labor, materials, tools, equipment, and supervision required to replace the existing brine disposal piping to the WH brine tanks with new cement lined piping and fittings, to be supplied by others as Government Furnished Equipment under WH-MM-767A.
CX(s) Applied: B1.3
Date: 04/22/2013
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall shall provide all labor, materials, tools, equipment, and supervision required to replace the existing brine disposal piping to the WH brine tanks with new cement lined piping and fittings, to be supplied by others as Government Furnished Equipment under WH-MM-767A.