Blast and Paint West Hackberry Meter Skid, Prover Piping and Structure CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
September 9, 2013Blast and Paint West Hackberry Meter Skid, Prover Piping and Structure
CX(s) Applied: B1.3
Date: 09/09/2013
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all transportation, materials, equipment, supplies, tools, facilities, utilities, labor and supervision required to blast and paint the West Hackberry Meter Skid, Prover Piping and Structure, located adjacent to the Control Room. All grating will be removed so that the I beam meter skid structure can be blasted and painted along with piping.
CX(s) Applied: B1.3
Date: 09/09/2013
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all transportation, materials, equipment, supplies, tools, facilities, utilities, labor and supervision required to blast and paint the West Hackberry Meter Skid, Prover Piping and Structure, located adjacent to the Control Room. All grating will be removed so that the I beam meter skid structure can be blasted and painted along with piping.