Bryan Mound Brine Disposal Pump Replacement CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
July 3, 2013Bryan Mound Brine Disposal Pump Replacement
CX(s) Applied: B5.2
Date: 07/03/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, materials, tools, equipment, supervision, and transportation required to supply two pumps to replace the existing Bryan Mound brine disposal pumps, BMP-115 and BMP-116.
CX(s) Applied: B5.2
Date: 07/03/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, materials, tools, equipment, supervision, and transportation required to supply two pumps to replace the existing Bryan Mound brine disposal pumps, BMP-115 and BMP-116.