Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install) CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
August 8, 2013Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install)
CX(s) Applied: B1.3
Date: 08/08/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, tools, equipment, materials (except GFE) and transportation required to remove existing BH oil circuit breakers OCB-4009, 4010 and 4011 and install three new 138 kilovolt SF6 circuit breakers (supplied as government furnished equipment) on the existing foundations. Tasks include all electrical work and testing of equipment.
CX(s) Applied: B1.3
Date: 08/08/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, tools, equipment, materials (except GFE) and transportation required to remove existing BH oil circuit breakers OCB-4009, 4010 and 4011 and install three new 138 kilovolt SF6 circuit breakers (supplied as government furnished equipment) on the existing foundations. Tasks include all electrical work and testing of equipment.