Synthesis of semiconductor perovskites (CH3NH3)PbI(3-x)(BF4)x and (CH3NH3)SnI(3-x)(BF4)x for the detection and imaging of nuclear materials.…
Secondary Road Maintenance activity. Replace failed 36" corrugated galvanized metal pipe with new 60" HP pipe. This activity will occur in Tims B…
This activity includes leachability testing of radioactive spiked monoliths as well as sorption and desorption of possible radionuclide spiked soli…
Warranty repair work on 902-4B Fire Water tank includes draining the tank, sanding interior seams of tank, then applying Epoxy to sanded areas. Rep…
Purchase additional 8,000 lbs. of Ch R-22 and store estimated 16,000-18,000 lbs. of R-22. …
Old lathe will be dismantled and removed from Section 7 of the IML Glovebox. A new lathe will be procured and installed in Section 8 of the IML Glo…
Replace caulking around all exterior windows, repair damaged sheetrock and repaint walls in offices 7, 9, 59, and 60 in Building 707-F.…
The once-thru AHU and exhaust system for the Inert Loading Facility (rooms 324 and 325) shall be replaced with a system that is more reliable and m…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
The proposed activity is to allow discharge of non-process HVAC chill water to the stormwater ditch that goes to the constructed treatment wetland …