Install a new HVAC system in the L-Area Disassembly / Transfer Bay Area to provide adequate cooling for personnel comfort.…
Install two new packaged HVAC units at +34' level of L-Area Complex to provide personnel heating & cooling at +15' level to replace CHU-1 and assoc…
Excavation activities to upgrade the H-Area trailer city parking lot with addition to the parking area.…
Subcontractor will provide roof repairs at Building 717-N. The Subcontractor will disturb the existing roof while performing these repairs on Build…
Painting and door replacement activities associated with Building 704-1N.…
902-3H Replace packing in valve H2-902-3-FP-V-022.…
Subcontractor will provide roof repairs at Building 773-A, F-wing.…
Replace bearings for on chilled water pump at 235-2F. The presumed asbestos containing material (PACM) gasket material at the flanges will be remov…
Excavate to obtain a soil sample from underneath the catch bucket at 715-2G Fueling Station, so the analytical results can be made available to Sou…
Remove one Presumed Asbestos Containing Material (PACM) gasket from ABRP well AHT-14. Removal of gasket will allow for maintenance to repair broke…