Remove and reinstall pressure relief valve SW-PRV-001 at 681-3G Pump House #3.…
Replace carpet in Building 751-1A, Room 17 using standard blue carpet squares.…
The contents of the 607-18A Trade Waste Tank will be removed, and the remaining sludge of silver will be recycled as a precious metal rather than d…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
The nature of this modification is to blow out the CW coils in the 234-4H Air Handling Unit (AHU) with air. To do this, each individual coil must b…
Replace the existing metal halide and fluorescent lights in the K- Area 105-K building with LED Technology.…
This is a treatability study to mitigate glycolate in real DWPF sample liquid material with added Slurry Mix Evaporator (SME) slurry. …
Insulation and mastic to be removed from chilled water piping feeding AHU-002 at 702-2A. Section to be removed to allow access to a y-strainer for …
Tile removal and replacement in 105-K Personnel Wing, Room 1013.…
Due to the need for increased efficiency in accessing the Material Access Area (MAA), a modification for the 105-K Entrance Control Facility (ECF) …