Removal of suspect asbestos gaskets from valves in Building 703-A to facilate replacement of relief valves, steam traps, and/or other valves associ…
Paint walls/door, replace floor tile, and ceiling tiles in Building 704-K Room 161 and prep/paint 704-K lunch room walls, doors, and replace ceilin…
As part of the C-Area Ground Water (CAGW) Removal Action and to reduce the risk of injury, Area Completion Projects will install handrails at the C…
The DCF will update a TCVG indicator from an obsolete model number to a new model supported by the vendor (Teledyne Hastings Instruments). The pre…
Trailers are to be moved to support Saltstone Disposal Unit 7 construction.…
Small samples (less than 100 mg) of porous aluminosilicate zeolite material are analyzed in an Autosorb iQ gas sorption analyzer manufactured by Qu…
Sealant to be applied on K-Area Disassembly Basin roof to prevent inleakage, as well as general housekeeping on K-Disassembly Basin roof.…
This scope of work covers activities associated with the development of electrolytic cell and catalyst reactor components for projects such as sulf…
Preparation of salt simulant solutions as well as cementitious waste forms that are representative of waste forms from SRS and offsite for testing.…
Corrosion testing per ASTM standards on stainless steels and corrosion-resistant alloys for intergranular corrosion susceptibility performed on met…