The Thomas Jefferson National Accelerator Facility (TJNAF or Jefferson Lab (J-Lab)) used a tritium filled vessel in a fundamental physics experimen…
Construction will remove and replace the bent gutter on North Side of Low Activity Waste Vault (LAWV).…
Upgrade lighting to LED as current bulbs expire.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is required. These excavati…
Vendor to clean Nurse Tanker SRO# 0148.…
Valve FE-2301 (H-264002-EXTR-HV-138) will be replaced with a like-for-like valve; however, the new valve will have an additional functionality of a ma
Improve work conditions inside 511-S for outage and project construction activities supporting the Salt Waste Processing Facility tie-ins by instal…
Remove and replace carpet in rooms 569, 570, 567, 566, 565, 564, 563, 562, 598, 597, 596, & 572. Rooms 596, 597, & 598 will have asbestos tile to …
Paint the wall as you turn right off the elevator on the 2nd floor from corner to corner. The paint should match the color that is currently on the…
Remove, replace, reinstall HPC-TRP-002 (steam trap) associated piping, insulation (non-asbestos). There is an associated presumed asbestos contain…