SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
This Laboratory Directed Research & Development (LDRD) is designed to evaluate the viability of a self-propagating synthesis method to stabilize an…
Fourier Transform Infrared (FTIR) uses a beam of infrared light to analyze a sample in a non-destructive manner. The samples are returned to custo…
This activity is ongoing and involves the operation and maintenance of an Ion Chromatography (IC) system(s) in 773-A B-134 containment units CHEX h…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containing mater…
Pursuant to encouraging results from the 2013/2015 Aerobic Bio-stimulation bench scale study using humate to treat Southern Sector groundwater cont…
A pre-built 12’ x 32’ storage building with be set up northwest of 782-4G in the Burma Road area. The purpose of the building is to store EC&ACP chem
Remove and install cove base in main corridors and foyers with same color/style. Prep and paint Room 125.…
Perform replacement of Rooftop Units (RTUs) #3, 4, 6, and 7B on the roof of Building 703-47A. The disconnect switch for RTU 9B will be replaced.
Remove west filter hold-down beam from 55 Elevation of the 105-L Building.…