Welding repairs on Steam Lines.…
This activity installs a new vendor-designed, skid-mounted chemical feed system adjacent to the north side of the 285-11H Cooling Tower return flum…
Remove pressure relief valve H-284000-DW-PSV-001 on water heater located inside Building 284-H. Water heater is to be abandoned in place.…
HB-Line will be entering Lay-Up status. The Process Air (PRA) system for HB-Line will not be needed to support the facility while in this configura…
Legacy insulation needs to be removed from Rm 602 in HB-Line. The insulation will be handled as asbestos.…
Construction will take an asbestos sample from electrical enclosures in the 4th Level Control and Hot Gang Valve Corridor…
Fabricate and install an aluminum cover over existing well northwest of Trailer 247-19F.…
Remove Pipe Insulation from Battery Room 100 in Building 772-7B.…
Remove PACM gasket for hoist motor and repair emergency gate hoist 001 at L-Lake dam.…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…