Install Universal Wiring (UW) drop in Building 730-2B, Cubicle 2082.…
New Pre-engineered metal building for the Forest Service. Activities include geotechnical survey, disposition of four existing trailers, and constr…
This project will provide for Chilled Water (CHW) thermal energy storage and other efficiency upgrades at the B-Area Chiller Plant.…
Replace lights in 717-F Machine Shop.…
Install additional receptacles in Building 736-A, Room 131.…
This system is intended to monitor and test the inside environment of a stainless steel canister filled with 97% He and 1% O2, 1% H2, 1% N2, and at…
The Zeiss Crossbeam 550 microscope is used to examine solid samples by electron imaging and x-ray spectroscopy.…
Replace the 285-H steam driven turbine with a like-for-like replacement.…
Provide and install all materials and wiring necessary for the installation of a new fiber optic cable between 719-5N and the new PECMC yard office…
Remove damaged section of non-asbestos insulation and jacketing from abandoned steam line south of 285-H. Remaining insulation and jacketing will b…