The Sikaflex sealer in the joints at the Heavy Water Component Test Reactor (HWCTR) have degraded. The existing material will be removed via wire w…
Proposed activity covers those actions associated with cleaning and maintenance of lasers and associated optics owned by AD at SRNL (A Area).…
This proposed activity will repair damage to the 221-H roof in an HB-Line storage area resulting from scaffling being blown over during a storm eve…
A treatability study will be performed to inject natural artesian groundwater from two nearby production wells in D-Area into the upper water table…
Soil Neutralization Amendments for the D-Area Coal Storage Area…
Site Infrastructure personnel perform recycling activities for Universal Waste Batteries from various locations at SRS.…
Wash/clean, caulk, and repaint Trailer 704-74F.…
Removal of possible asbestos gasket from Pressure Safety Valves (PSV) PSV6013/PSV6014/PSV6016/PSV146 at 717-F Construction Bay Low Pressure Piping …
Troubleshoot and repair Heating Water Circulating Pump #006 in Building 735-1B.…
A leak has occurred on the piping of the Neutralization System at 723-A. The piping and Pump-001 will be replaced. Gaskets at flanges are PACM (Pre…